Prime Contractor · Brazil

Local Execution for Global IT Programs.

TC Tech Infra is the Brazilian prime contractor for international MSPs and IT consultancies that need certified on-site execution without building a local operation. We deliver smart hands, field engineering, structured cabling, network installation, IMAC and data center programs across São Paulo state and beyond. Every engagement opens under NDA, runs against a signed SOW, and dispatches on 4h/8h SLA tiers integrated with your ticketing system. Execution is backed by Dell Technologies Corrective Maintenance and Microsoft certifications. A Brazilian CNPJ under the service-export framework and SWIFT/BIC-capable banking make international contracting straightforward.

Submit LATAM Program Request
SOW Protected Engagement

Strategic Execution Partner


For a global IT program, Brazil is rarely a technology problem — it is a coordination problem: Portuguese-speaking site contacts, an unfamiliar tax framework, dispatch geography measured in hundreds of kilometers, and vendor-certification requirements. TC Tech Infra absorbs that coordination as a single accountable prime contractor. Your program managers keep their process, their ticketing and their documentation standards; we supply the certified local execution layer underneath them.

TC Tech Infra supports international MSPs executing SLA-driven infrastructure programs across Brazil through structured on-site service delivery.

SLA Compliance

Contracted 4h/8h on-site response with auditable dispatch and arrival timestamps. Tickets integrate with ServiceNow, Remedy or Jira.

L1–L2 Engineering

Break-fix response and structured infrastructure tasks executed by certified engineers. Clean escalation paths to your remote L3 teams.

Full Documentation

Work Completion Reports, time-stamped photo evidence and as-built documentation on every engagement. Deliverables follow your format — PDF, JSON or customer template.

NDA Engagement

An NDA is signed before any program data is shared. Design intent, IP addressing, topology and credentials stay protected end to end.

Infrastructure Portfolio

🔧

Smart Hands Support

  • Rack & Stack Services
  • Fiber / Copper Patching
  • Component Replacement
  • Visual Verification & Testing
  • Remote-Directed Execution
View Details →
⚙️

Field Engineering

  • IMAC Programs
  • SD-WAN Deployment
  • Site Surveys & Readiness Audits
  • Hardware Replacement Programs
  • L1 / L2 On-Site Dispatch
View Details →
📋

Documentation & Reporting

  • Work Completion Records (WCR)
  • Photo-Based Evidence Reports
  • Asset Tagging & Inventory Logs
  • Customer Sign-Off Documentation
  • Chain of Custody Tracking
View Details →
🌐

Network & Infrastructure

  • Network Equipment Installation
  • Infrastructure Deployment
  • Cabling & Patching
  • Asset Inventory Handling
  • SLA-Based On-Site Support
View Details →

Service Execution Workflow

End-to-end traceability and SLA alignment with global IT support programs.

01.Service Request Intake
02.Scope & Dispatch Planning
03.Engineer Allocation
04.On-Site Intervention
05.Photo-Based Reporting
06.WCR Generation
07.Customer Sign-Off
08.Documentation Delivery

Executed On-Site.
Documented by Design.

A sample of recent executions by TC Tech Infra engineers at enterprise sites in Brazil: primary and secondary carrier link implementations, ISP migration cutovers, and SD-WAN edge deployments — delivered in shared racks, live environments and contracted change windows.

Dual-carrier uCPE appliances installed for primary and secondary link implementation at enterprise site in Brazil
Primary + Secondary Carrier Link Implementation
High-availability firewall stack recabled during ISP migration cutover at enterprise site in Brazil
HA Firewall Stack — ISP Migration Cutover
SD-WAN edge appliances and redundant firewalls deployed in branch rack in Brazil
SD-WAN Edge Deployment with Redundant Firewalls
uCPE platform racked and cabled for SD-WAN service chaining at client site in Brazil
uCPE Platform Installation — SD-WAN Service Chaining
Branch access switch and security appliance commissioned with structured patching in Brazil
Branch Access Layer Commissioning

Images are from real engagements in shared colocation and client racks. Carrier names, client identifiers, labels and addressing have been removed or anonymized — the same NDA discipline that protects these clients governs every program we execute.

Certified Execution
with Operational Track Record

Field execution is backed by Dell Technologies Corrective Maintenance certification across PowerEdge, PowerStore, PowerScale, Unity XT, Data Domain and Connectrix. Microsoft AZ-900, MS-900 and SC-900 certifications support cloud and security-adjacent tasks. Active operational delivery includes field engineering programs for Tier-1 global IT service providers and large international consultancies — confidential program execution under NDA and SOW. TC Tech Infra is a Brazilian CNPJ operating under the service-export tax framework. Corporate banking is SWIFT/BIC capable for international invoicing in USD or EUR.

Dell · PowerEdge (rack/tower/modular)Dell · PowerStoreDell · PowerScaleDell · Unity XTDell · Data DomainDell · AvamarDell · VPLEXDell · ConnectrixMicrosoft · AZ-900Microsoft · MS-900Microsoft · SC-900

Enterprise Compliance
Framework

01.
NDA-Based Engagement

All client programs initiated under Non-Disclosure Agreement. Confidentiality guaranteed across all operational levels.

02.
SOW Execution Support

Full Statement of Work compliance with milestone tracking, deliverable documentation, and structured sign-off.

03.
SLA-Based Delivery

Guaranteed response times with auditable records. 4h/8h on-site SLA compliance across all active regions.

04.
Asset Chain of Custody

End-to-end asset tracking from receipt to installation, with photo evidence and documented transfer records.

05.
Structured Reporting

WCR generation, photo-based field reports, and inventory logs delivered in client-specified formats.

06.
Vendor Support Capability

Aligned with global MSP vendor standards. Escalation paths, remote coordination, and ticket-based dispatch.

Common Questions
from International Programs

How does TC Tech Infra engage with international clients without a local Brazilian entity?

You contract directly with our Brazilian CNPJ under the service-export tax framework — no local entity or representative is required on your side. Invoicing runs through SWIFT/BIC-capable corporate banking. The commercial relationship works like any other international vendor agreement.

What is the typical engagement model for a smart hands or field engineering program?

Engagements open with an NDA, followed by a SOW defining scope, SLA tiers and deliverables. Dispatch then runs ticket-based from your ITSM, and every visit closes with a Work Completion Report and photo evidence.

Can TC Tech Infra integrate with our ITSM (ServiceNow, Remedy, Jira)?

Yes — dispatch is driven from your ticket queue, and status updates flow back into the same ticket through closure.

What technical certifications do TC Tech Infra engineers hold?

Dell Technologies Corrective Maintenance certification covers PowerEdge, PowerStore, PowerScale, Unity XT, Data Domain, Avamar, VPLEX and Connectrix. Microsoft AZ-900, MS-900 and SC-900 cover cloud and security fundamentals.

What is the geographic coverage and dispatch model in Brazil?

São Paulo capital is the same-day hub, with 15 mapped cities across a 500 km radius on next-day or project-based windows. Sites outside the footprint are handled project-based. Expansion to Rio de Janeiro, Curitiba, Brasília and wider LATAM is available on request.

How is confidentiality maintained for program-sensitive infrastructure data?

An NDA is executed before any program data is shared, and access is scoped per engagement. Credentials, topology and design data are handled only within the agreed program boundary.

Start Your
LATAM Program


Describe your program scope below — sites, SLA requirements and timeline. Our team responds within one business day.

Web
www.tctechinfra.com
Coverage
Brazil · LATAM

Request Received

Our team will be in touch within one business day.

All engagements are protected under NDA upon initiation.